MASTER AUDIO ANALYSIS

Behind Schedule

Jook
Musical Key
C# Major

Acoustic Analysis DNA

The track by Behind Schedule Jook features a tempo of 183 BPM and is composed in the key of C# Major. Based on audio DNA, its loudness is measured at -8.95 dB.

Tempo 183BPM
Popularity 3%
Duration 5:40
Loudness -8.95dB

Acoustic Analysis DNA

Energy 0.4790

Intensity and activity of the track.

Danceability 0.3980

Suitability for dancing (rhythm, stability).

Valence (Mood) 0.0387

Musical positiveness (Happy vs Sad).

Acousticness 0.0076

Probability the track is acoustic.

Speechiness 0.1240

Presence of spoken words.

Instrumentalness 0.8490

Ratio of instrumental vs vocal content.

Record Label
Sector 7 Sounds
Release Date
2018-02-09
ISRC Registry
UKKE71700026
Spotify Identity
2rBu7WScVaqAAV70YzXv3M